ONE-Dyas awards Enersea contract for pipeline and riser design for their Electrified NO5-A gas production platform

Enersea is pleased to participate with the riser and pipeline design for the N05-A project which will be installed in the Dutch part of the North Sea. The platform will be powered completely by renewable energy from the nearby Riffgat Offshore Wind Farm.

This new to be build Dutch electrified offshore gas platform is a project of ONE-Dyas who are planning to deliver the first gas by the end of 2024.

30% lower carbon footprint

In view of CO2 emissions, this future locally produced gas has a 30% lower carbon footprint than imported natural gas. Next to this, domestic gas production increases the security of supply. This project makes an active contribution to the energy transition and to achieving the EU goals of the Climate Agreement, in a safe and responsible manner.

The engineers at Enersea play an active role in the energy transition in the Netherlands and Western Europe with design & engineering for offshore wind farms, equipment design for cable lay and pipelay vessels, research & concepts for hydrogen platforms and electrification of oil & gas platforms.

Feel free to get in touch!

Looking forward to meeting you.

Dieter Korndorffer - Managing Consultant

Get in touch

Fill out the form below, and we’ll get back to you soon.

This field is for validation purposes and should be left unchanged.